FPSO Balaine Project - Phase 1

METRADE was extensively involved in supplying complete piping material on a FAST TRACK basis for the complete rebuilding of FPSO BALAINE –Phase 1. The FPSO landed in Dubai Drydocks at the start of November and the contractor had 7 months to complete the project and handover back to the client.

The METRADE team worked day in day out to assist the complex requirement and was side by side with the contractor and the fabricator and assisted to complete the piping valves for the project. This has been by large one of the most difficult and challenging orders that was handed over to us by any client.